High Speed Rail 2 has potential to become an iconic national treasure

Regeneration Tue, Mar 22, 2016 5:27 PM

High Speed Rail 2 has potential to become an iconic national treasure

Planners are being urged to be as ambitious as they dare when designing the new high speed rail station for Birmingham - and create a grand and memorable civic entrance to a revitalised city.
 
Kathryn Moore, Professor of Landscape Architecture at Birmingham City University, is advising business and civic leaders that “as long as we adopt a holistic, inclusive approach to the overall planning of high speed rail, HS2 has the potential to act as a catalyst for wider social and economic transformation”.
 
Professor Moore is set to speak at the Greater Birmingham and Solihull LEP HS2 co-ordinating committee followed by a separate appearance at Birmingham City Council’s own HS2 scrutiny committee.
 
“There is a tremendous opportunity for HS2 stations to signal a new approach - using a different baseline and supported with a different mindset, working practices and economic models. The HS2 stations should be designed to energise the city.
 
“This is an opportunity to maximise this project in a positive, progressive way to ensure it contributes to the quality of life.”

The initial phase under the proposed High Speed 2 scheme is to create a new railway line between London and the West Midlands which would carry 400m-long trains at speeds of up to 250mph - faster than any current operating speed in Europe.

The new line would run into Birmingham’s Eastside district, which is earmarked for a new station. A second phase of development would deliver a “V-shaped” link from Birmingham and running to Manchester and Leeds.

The Department for Transport says the project will cut Birmingham-London journey times from 1hr 21min to 49min. After the second phase, Manchester-London journeys would take 1hr 8min (down from 2hr 8min), and Birmingham-Leeds 57min (from 2hr). This would effectively reduce journey times between London and Edinburgh and Glasgow by an hour to 3hr.

The High Speed 2 hybrid bill, which will give the Government powers to construct and operate Phase One between London and Birmingham, has been published this week.

Supporters claim the project will bring huge economic benefits to the Midlands and the North while those who oppose the scheme are concerned about its costs and challenge the return on investment claims.

Featured News

Specification news
Light throughout – divide space with glass Skyfold...

Companies looking to divide room space while maximising light should consider the...

Read More >>

Specification news
Promat provides fire resistant glazing solutions for...

Fire resistant glazing and fire-rated glass door-sets manufactured by Promat UK have...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Your Specialist Partner in Composite Steel Roof & Floor Decking Brochure

Your Specialist Part...
By RMD Profiles Ltd

Download Now >>

PVC-U System Fully Reversible Windows by Epwin Window Systems Brochure

PVC-U System Fully R...
By Epwin window systems...

Download Now >>

Spectus Bevelled Windows and Doors Brochure

Spectus Bevelled Win...
By Epwin window systems...

Download Now >>

Vertical Sliding Sash Window Brochure

Vertical Sliding Sas...
By Epwin window systems...

Download Now >>

Two-Part Cill System Brochure

Two-Part Cill System
By Epwin window systems...

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

DUOFLEX
DUOFLEX

DUOFLEX is a high quality elastomeric bitumen, hot bonded to the substrate incorporating the fleece...

Read More >>

TECSOUND
TECSOUND

TECSOUND is a polymer based, bitumen-free, high-density synthetic membrane. The combination of its...

Read More >>

ISOLAIR MULTI
ISOLAIR MULTI

ISOLAIR MULTI is a natural and ecological vapour-permeable, windproof and water-repellent thermal...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

RMD Profiles - UK Experts in Metal Decking, Design Installation
RMD Profiles - UK Experts in Metal Decking, Design Installation

At RMD Profiles, we’re more than just metal decking. From supply-only solutions to full design and...

Watch Now >>

A responsible addition: HIMACS shapes are now SCS-Certified for recycled content
A responsible addition: HIMACS shapes are now SCS-Certified for recycled content

HIMACS has long been the solid surface material of choice for architects and designers looking for a...

Watch Now >>

Our SUSTAINABILITY Roadmap
Our SUSTAINABILITY Roadmap

Myson has a clear sustainability strategy in line with the UN Sustainable Development Goals (SDGs)...

Watch Now >>