University gives approval for phase one of development

Regeneration Tue, Mar 22, 2016 5:09 PM

University gives approval for phase one of development

The governing body of the University of Cambridge, Regent House, has given formal approval for the commencement of the first phase of the North West Cambridge development.

Pro-Vice-Chancellor Jeremy Sanders welcomed the decision. “The North West Cambridge development is a major part of the University’s long term future," he said.

"It will provide much of the residential and research accommodation that the University needs as it grows over the next 20 years.  Attracting world-class academics, researchers and research partners is vital if the University is to retain its world-class position.  

"Being able to provide high-quality, affordable housing in a thriving community will be an important element of our attraction to staff and students, and Phase One of the development focuses on this immediate need. The endorsement of the University’s Regent House illustrates the positive commitment that members from across the University and Colleges have towards the continuing success of Cambridge and the wider city region.”

In August 2012 the three local authorities involved resolved to grant outline planning permission for a mixed-use development on the 150-hectare site of University owned farmland in the North West quadrant of the city, subject to the signing of a Section 106 legal agreement, planning conditions and  reserved matters approvals.

Phase One of the development will include approximately 530 homes for qualifying University and College staff, 450 homes for sale through residential developers, accommodation for 300 students, the local centre along with community facilities and much of the site infrastructure, which will enhance connections to and within the local area.  The development also includes substantial landscaping with over a third of the overall site dedicated to both formal and informal green space.

Phase one is estimated to cost £281 million, with the scheme in its entirety costing £1 billion.

Roger Taylor, Project Director of the North West Cambridge Development said: “North West Cambridge is the largest development in the country to be built to the Code for Sustainable Homes Level 5 and BREEAM Excellent for other uses.  

"The ambition to create a low-carbon community incorporates a Green travel plan and energy and utilities systems - the development will be an exemplar of sustainable living.”

Subject to the approval by the local planning authorities, work on infrastructure will start later in 2013, and the first buildings will be completed from late 2015.

Featured News

Specification news
James Hardie launches Conceal System for Hardie Panel,...

James Hardie, the world leader in the manufacture of high-performance fibre cement...

Read More >>

Specification news
IG Masonry Support achieves industry-first BBA...

Building product manufacturer IG Masonry Support is delighted to announce its Welded...

Read More >>

BUILDING PRODUCT LIBRARY - LATEST BROCHURES

Paints & Coatings Brochure

Paints & Coatings
By F.H. Brundle

Download Now >>

Cedral Roofs Brochure Brochure

Cedral Roofs Brochur...
By Cedral by Etex

Download Now >>

Cedral Facades Brochure Brochure

Cedral Facades Broch...
By Cedral by Etex

Download Now >>

2026 Product Brochure Brochure

2026 Product Brochur...
By ​The Radiator Compan...

Download Now >>

System for Laying Floor and Wall Coverings Brochure

System for Laying Fl...
By FassaFloor

Download Now >>

BUILDING PRODUCT DIRECTORY - LATEST PRODUCTS

Aluminium Framing System
Aluminium Framing System

Benefits: Decking and BeyondThe benefits of aluminium framing systems: Why Outdure® Qwickbuild®...

Read More >>

Aluminium Fencing
Aluminium Fencing

When it comes to securing your property while enhancing its aesthetic appeal, few fencing solutions...

Read More >>

Adjustable Pedestals & Paving Supports
Adjustable Pedestals & Paving Supports

The smarter, faster way to lay perfectly level decking, paving, and flooring on any surface.Whether...

Read More >>

CONSTRUCTION VIDEOS - LATEST VIDEOS

Fortitude™ Steel Railing Systems: Adjustable Off-the-Shelf Balustrade Guide
Fortitude™ Steel Railing Systems: Adjustable Off-the-Shelf Balustrade Guide

Fortitude Steel Railings and Balustrades are one of the most versatile, off-the-shelf, steel...

Watch Now >>

Pro-Railing® Stainless Steel Handrail Systems: 6 Modern Balustrade & Glass Railing Solutions
Pro-Railing® Stainless Steel Handrail Systems: 6 Modern Balustrade & Glass Railing Solutions

Pro-Railing® – our Stainless Steel Handrail Component System with six stunning ranges to choose...

Watch Now >>

Why Professionals Choose Outdure QwickBuild | Aluminium Deck Frame Case Study
Why Professionals Choose Outdure QwickBuild | Aluminium Deck Frame Case Study

This case study explores a stunning designer terrace featuring the Outdure QwickBuild system,...

Watch Now >>